Question No: 111 – (Topic 1)

What is the meaning of a red DRS cluster?

  1. Yellow clusters will become red after 15 minutes if DRS is unable to dynamically balance the load.

  2. Red clusters indicate virtual machines are using more resources than the fixed reservation allows.

  3. At least one host in the cluster is attempting to go into Maintenance mode.

  4. Red clusters are the highest priority and will receive resource allocations first.

Answer: B

Question No: 112 – (Topic 1)

A physical Network device associated with a vSwitch is overloaded: Which of the following actions can be taken to reduce the overload? (Choose Three.)

  1. move virtual machines from the affected vSwitch to other available vSwitches

  2. configure additional VLAN port groups on the same vSwitch

  3. add the VMkernel TCP/IP networking stack

  4. configure traffic shaping

  5. add an additional vmnic to the affected vSwitch

Answer: A,D,E

Question No: 113 – (Topic 1)

Which statement is true about the database used for VirtualCenter evaluations?

  1. The optional MSDE database can only be used if installed prior to running the VirtualCenter installer.

  2. MS Access may be used as an evaluation database, but it must be upgraded before VirtualCenter is used in a production environment.

  3. The VirtualCenter installer provides the option to automatically install and configure an MSDE database.

  4. Evaluation licenses do not allow VirtualCenter to connect to a remote database.

Answer: C

Question No: 114 – (Topic 1)

Click the Exhibit button.

Assuming this is the only virtual machine, and the only resource pool, what is the maximum amount of memory that could be assigned to the virtual machine that is part of the Finance Resource Pool?

Ensurepass 2018 PDF and VCE

A. 163840 MB

B. 3009 MB

C. 160831 MB

D. 57 MB

Answer: A

Question No: 115 – (Topic 1)

What are the three possible storage multi-pathing policies that you can set in ESX Server 3.5? (Choose Three.)

  1. Fixed

  2. Persistent Binding

  3. Open Shortest Path First (OSPF)

  4. Most Recently Used (MRU)

  5. Round Robin

Answer: A,D,E

Question No: 116 – (Topic 1)

What is the maximum number extents of a VMFS3 volume?

A. 128

  1. 32

  2. 64

D. 256

Answer: B

Question No: 117 – (Topic 1)

A VirtualCenter Administrator assigned you Administrator privileges on an ESX Server Cluster. You are unable to connect the Virtual Infrastructure Client to the ESX Server directly. What is a possible cause of this problem?

  1. User names and permissions are not propagated from VirtualCenter to ESX Servers.

  2. You need Administrator privileges on the server and all of its resource pools.

  3. You still have a Virtual Infrastructure Client connected to the VirtualCenter server.

  4. Administrators are not allowed to log in to ESX Servers.

Answer: A

Question No: 118 – (Topic 1)

Which of these factors indicates a high likelihood that a virtual machine#39;s performance is being constrained by disk I/O?

  1. A large number of disk shares

  2. A long SCSI queue length

  3. A large number of kilobytes read and written

  4. A large number of virtual disks on its SCSI bus

Answer: B

Question No: 119 – (Topic 1)

A company wants to install Application Y in a virtualized environment. The underlying operating system has to be Windows NT 4.0 SP6a. In a physical environment, the application and supporting software have very strict minimum hardware requirements.

Which two requirements prohibit the use of an application inside a virtual machine? (Choose Two.)

  1. 3 NICs

  2. 8 separate disks

  3. 4 GB RAM

  4. 2 CPUs

Answer: C,D

Question No: 120 – (Topic 1)

What is true about the installation of Virtual Infrastructure (VI) Web Access?

  1. It is always installed on ESX Server and VirtualCenter.

  2. It is optional on both ESX Server and VirtualCenter.

  3. It is always installed on ESX Server and optional on VirtualCenter.

  4. It is always installed on VirtualCenter and optional on ESX Server.

Answer: C

100% Ensurepass Free Download!
Download Free Demo:VCP-310 Demo PDF
100% Ensurepass Free Guaranteed!
VCP-310 Dumps

EnsurePass ExamCollection Testking
Lowest Price Guarantee Yes No No
Up-to-Dated Yes No No
Real Questions Yes No No
Explanation Yes No No
PDF VCE Yes No No
Free VCE Simulator Yes No No
Instant Download Yes No No

Leave a Reply

Your email address will not be published. Required fields are marked *